| Description |

Inspection 1. Connect the GDS on the Data Link Connector (DLC). 2. Turn the ignition switch ON. 3. Measure the output voltage of the APS 1 and 2 at C.
Specification Pressure [kPa (kgf/cm², psi)]Output Voltage (V)-6.67 (-0.06, -0.97)0.502.5+6.67 (0.068, 0.97)4.5
C
Inspection 1. Ignition "ON" 2. Manually operate the control switch and measure the voltage of blower motor. 3. Select the control switch to raise voltage until high speed. Specification FanMotor VoltageManualFirst speed3.8 ±0.5VSecond speed5.