| Removal |
| 1. |
Disconnect the vapor hose (A). |
| 2. |
Remove the PCV valve (B).
|
| Inspection |
| 1. |
Insert a thin stick (A) into the PCV valve (B) from the threaded side to check that the plunger moves.
|
| Installation |
| 1. |
Install in the reverse order of removal.
|
Operation Principle
Removal 1. Disconnect the negative (-) battery terminal. 2. Remove the glove box housing. (Refer to Body - "Glove Box Housing") 3. Remove the SVM unit (B) after disconnecting the connectors (A) and mounting bolts. Installation 1. Install the SVM unit.
Description 1. The function of cluster ion generator is cleaning air by sterilizing and dissolving of air conditioner. 2. The function of cluster ion generator is controlling mold caused by stench of air conditioner and external inflow of air.