| Removal and Installation |
| 1. |
Remove the engine cover (A).
|
| 2. |
Installation is reverse order of removal |
Components 1. Engine room front under cover2. Engine room RH side cover3. Engine room LH side cover
Inspection 1. Measure the pressure of high pressure line by measuring voltage output between NO.1 and NO.2 terminals. 2. Inspect the voltage value whether it is sufficient to be regular value or not. Voltage = 0.00878835 * Pressure + 0.37081095 [PSIA] 3.
C