| Valve Clearance Inspection And Adjustment |
Inspect and adjust the valve clearance when the engine is
cold (Engine coolant temperature : 20°C(68°F)) and cylinder head is
installed on the cylinder block. |
| 1. |
Remove the cylinder head cover.
(Refer to Cylinder Head Assembly - "Cylinder Head Cover") |
| 2. |
Set No.1 cylinder to TDC/compression.
|
| 3. |
Inspect the valve clearance.
|
| 4. |
Adjust the intake and exhaust valve clearance.
|
Components 1. RH Cylinder head2. RH Cylinder head gasket3. LH Cylinder head4. LH Cylinder head gasket5. Cylinder block 1. Camshaft bearing cap 2.
Removal [LH] 1. Remove the Intake manifold. (Refer to Intake And Exhaust System - "Intake Manifold") 2. Remove the high pressure fuel pump.
Description System Overview The System offers the following features: – Human / machine interface through a 1-stage button, for terminal switching and engine start. – Control of external relays for ACC / IGN1 / IGN2 terminal switching and STARTER, without use of mechanical ignition switch.
Component Location Components 1. Heater Case (LH)2. Separator3. Evaporator Core4. Shower Duct (LH)5. Heater Core Cover6. Heater Core7. Mode Actuator8. Mode Cam9. Temp Actuator (Drive)10. Vent Door Arm11. Floor Door Arm 1. Heater Case (RH)2.