| Circuit Diagram |

Components 1. Front housing2. Planet gear shaft assembly3. Lever4. Lever packing5. Starter solenoid assembly6. Packing7. Planet gear 8. Shield9. Armature assembly10.
Removal 1. Turn the ignition switch OFF and disconnect the battery negative (-) cable. 2. Remove the under (A) and (B). 3. Remove the starter cover (A).
Replacement 1. Remove the condenser, and then remove the bottom cap (B) with L wrench (A) from the condenser. Tightening torque : 9.8~14.7N.m (1.0~1.5kgf.m, 7.2~10.8 lb-ft) 2. Remove the desiccant (A) from condenser using a long nose plier.
Replacement 1. Disconnect the negative (-) battery terminal. 2. Recover the refrigerant with a recovery/ recycling/ charging station. 3. When the engine is cool, drain the engine coolant from the radiator. 4. Remove the expansion valve cover (A).