Inspection Lighting Switch Inspection With the multi function switch in each position, make sure that continuity exists between the terminals below.
Component Location 1. Horn switch2. Horn relay (Engine room compartment)3. Horn - High pitch4. Horn - Low pitch5. Clock spring
Removal 1. Disconnect the negative (-) battery terminal. 2. Remove the glove box housing. (Refer to Body - "Glove Box Housing") 3. Remove the SVM unit (B) after disconnecting the connectors (A) and mounting bolts. Installation 1. Install the SVM unit.
Inspection 1. Ignition "ON" 2. Manually operate the control switch and measure the voltage of blower motor. 3. Select the control switch to raise voltage until high speed. Specification FanMotor VoltageManualFirst speed3.8 ±0.5VSecond speed5.