Removal and Installation 1. Remove the oil level gauge rod (A) and the oil level gauge (B). Tightening torque: 18.6 ~ 22.6N.m (1.9 ~ 2.3kgf.m, 13.
Components 1. Air duct2. Breather hose3. Air intake hose4. Air cleaner assembly
Removal 1. Disconnect the negative (-) battery terminal. 2. Remove the LDWS unit cover (A). 3. Remove the LDWS unit connector (A). 4. Remove the LDWS unit after widening the mounting clips. Installation 1. Install the LDWS unit. 2.
Inspection 1. Ignition "ON" 2. Manually operate the control switch and measure the voltage of blower motor. 3. Select the control switch to raise voltage until high speed. Specification FanMotor VoltageManualFirst speed3.8 ±0.5VSecond speed5.